Hello
I have a new N3048 switch to add into our current stack of 2 N3048's to provide more capacity. Before switching on for the first time I would like to know if I need to run through the initial config or can I just connect the new switch to the stack and power on, will it then get the config from the master switch?
The firmware also needs updating on the stack, should I do this first or when all 3 switches are in the stack?
Many thanks.