Hi All,
Actually I have bought 2 N2000 series and now I have bought another one. (So I have 3 now).
I have the stacking cables.
My Question is :
- how do I stacking the 2 switch with 1 new switch? (Best Practice)
- Do I need to shutdown first the 2 switch to deploying stack cable?
- Is there any document to troubleshoot if I fail doing stack?
Please kindly need your help.
Thanks before,