i have 2 switches 6224 with stack and config its ok.
dell#show switch
Management Standby Preconfig Plugged-in Switch Code
SW Status Status Model ID Model ID Status Version
--- ---------- --------- ------------- ------------- ------------- -----------
1 Mgmt Sw PCT6224 PCT6224 OK 3.3.3.3
2 Stack Mbr Oper Stby PCT6224 PCT6224 OK 3.3.3.3
but, i have same problem in my enviroment VMWare 5.1 with HA
example:
i have 3 server with 4 ports at each server
Server 1 > 2 ports for iSCSI and 2 ports for traffic of networks
Server 2 > 2 ports for iSCSI and 2 ports for traffic of networks
Server 3 > 2 ports for iSCSI and 2 ports for traffic of networks
Traffic Networks
Server 1 > 1 port in port 1 switch 1, port 2 in port 1 in swtich 2
Server 2 > 1 port in port 2 switch 1, port 2 in port 2 in swtich 2
Server 3 > 1 port in port 3 switch 1, port 2 in port 3 in swtich 2
The problem, if i disconnect all ports in switch 2 of traffic networks, the enviroment works ok, but when i connect cable in switch 2
the enviroment crash and back work just when i disconnect the cable of switch 2.
In my VMWare Distributed Switch i have configure 2 ports with route base on ip hash.
i would like have in my enviroment the switchs in stack work together with vmware HA in nics of servers.
sameone have sugestion of this problem for vmware works ok with dell 6224 stacked
Regards