Hello All,
We are replacing our Powerconnect switches with N2048 for the Access Layer and (2) N4032 at the core. I have never used stacking in the past and was hope to manage the members as one. Would it be possible to stack the Access switches and also LAG them to the core for redundancy? The core could be stacked as well, but I'm reading that MLAG is faster for failover.
Should I have a problem with this config?
Thanks for any advice.
Charles