Hello,
I own 2 N4032 units configured as stack.
I'm about to replace the master unit with a new one.
I already restored all configuration to the new switch same as the one I'm going to replace.
I would like to understand what is the best procedure for this kind of process.
Do I need to power off both units before I proceed?
Can I just plug out the switch and put the new one and connect the stack cable?
Do i have to reload the slave switch?
Thank you