Quantcast
Channel: PowerConnect Forum - Recent Threads
Viewing all articles
Browse latest Browse all 2954

Configure MXL Blade switches for active paths using 2 qty CNA

$
0
0

Dear members,

I need to configure a solution in which qty2 CNAs Qlogic 57810s are been used in LOM & port B of each m630 blade server, converged MXL switches placed in A1A2 & B1B2 slots. All the switches have below mentioned IO modules:

  • SFP+ 10GbE Module 4 port Hot Swappable 4x SFP+ ports (optics or direct attach cables)
  • Fibre Channel Flex I/O Module with 4xDell Networking, Transceiver, SFP+,FC,150M,SW,FIN

Below are the requirements of client

  • Stack A1A2
  • Stack B1B2
  • All paths for SAN from Flex IO modules & for LAN from SFP+ must be active active to achieve CNA level redundancy. attached is a diagram for better understanding.
  • All the empty ports from each blade switch will be terminated at DMZ switch of the customer by using SFP+ to 1GBE RJ45 convertor.

I know how to stack A1A2 together & B1B2 switches together, i need to know what should be configured at CNA level to support active active connections/paths. plus A1A2 & B1B2 switches to support FIN &  Flex IO for a converged n/w infra.


Viewing all articles
Browse latest Browse all 2954

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>